We specialise in efficient installations in sites with confined access. View our case study below detailing how we installed a backup power system in the Newcastle Civic Offices.
To supply and install a backup power system to protect Newcastle Civic Offices in the event of a power-cut.
UPS Direct supplied a 310kVA generating set, project managing the delivery, unloading, assembly and comissioning of the unit - all with minimum disruption.
The project was run entirely to plan, with UPS Direct arranging all permits and logistics. The generating unit and power protection are installed. The Civic offices can operate in the confidence that their power supply is fail-safe.
| Delivery Generating set is delivered and dismantled to enable it to enter the building apetures. Click to play as a Quicktime movie |
|
| Install preparation Gas and water mains are protected with a scaffold cage. Click to play as a Quicktime movie |
|
| Install by crane The component parts are lowered through the apeture. Click to play as a Quicktime movie |
|
| Positioning Component Parts Component parts are located in the basement. Click to play as a Quicktime movie |
|
| Assembly The unit is reassembled and checked. Click to play as a Quicktime movie |