Installation Case Study

We specialise in efficient installations in sites with confined access. View our case study below detailing how we installed a backup power system in the Newcastle Civic Offices.

Project Outline:

To supply and install a backup power system to protect Newcastle Civic Offices in the event of a power-cut.

The Solution:

UPS Direct supplied a 310kVA generating set, project managing the delivery, unloading, assembly and comissioning of the unit - all with minimum disruption.

The Result:

The project was run entirely to plan, with UPS Direct arranging all permits and logistics. The generating unit and power protection are installed. The Civic offices can operate in the confidence that their power supply is fail-safe.

Delivery
Generating set is delivered and dismantled to enable it to enter the building apetures.

Click to play as a Quicktime movie
Install preparation
Gas and water mains are protected with a scaffold cage.

Click to play as a Quicktime movie
Install by crane
The component parts are lowered through the apeture.

Click to play as a Quicktime movie
Positioning Component Parts
Component parts are located in the basement.

Click to play as a Quicktime movie
Assembly
The unit is reassembled and checked.

Click to play as a Quicktime movie